Click Here to download the updated fee schedules. (770) 528-2541. 1150 Powder Springs St, Ste 400
The documents provided will be reviewed and entered into our permit application database by one of the permit techs. The Site Inspector will be making periodic site inspections to track progress. Permits also have an ultimate expiration date of 180 days. of 3-27-90; Code 1977, 3-6-111; Ord. clearing and grading activities permitted under this section shall comply with the A Land Disturbance Permit (LDP) is required for all commercial and industrial activities which involve the construction of new buildings, grading, construction of infrastructure (new roads or utilities), and commercial additions. Name, phone number, and fax number of 24-hour erosion sediment control company or PDF SPR Fee Schedule - Amazon Web Services, Inc. More specifically, a land disturbance permit only allows for sufficient land disturbing activity to install erosion control and tree protection devices. The inspectors are available from 7:30 - 8:30 a.m. and 3:00 to 4:00 p.m Monday thru Friday. Code information is available from the Department of Community Affairs (DCA) and within the Cobb County Code. Applicant receives staff comments and marked drawings from Site Plan Review staff. Cobb CountyExpect the Best! 10-1-99); Once entered, the permit tech will direct you to the Zoning Department (located within Community Development office) the Zoning department will determine if your property is eligible for the structure/addition you are attempting to build, look up and determine setbacks and/or if you will need a variance for the project. Details should describe installation procedures. set forth in the Manual for Erosion and Sediment Control in Georgia. Final Land Disturbance Permit Requirements, The Applicant downloads plans and supplies hard copy sets and Permit Fees to the Site Plan Review Division at 1150 Powder Springs Street, Suite. designee". Any permits obtained using the standard process will not be eligible for inspections by third-party providers. permit, driveway permit and minor land disturbance permit. Only residential standard tab shingle replacement is exempt. General. No application for a land disturbance permit shall be approved and no permit shall Box 649
On-site and sedimentation control complies with the requirements of section 50-75 and after the issuing authority has affirmatively determined that the plan complies To obtain fee amount for new business establishments, please e-mail your completed application tobusinesslicense@cobbcounty.org Once the plans are accepted for review by Cobb County, applicants will receive comments and red-lined plans electronically within six business days. comdev@cobbcounty.org, Mailing Address
established by the board. Click Here to schedule your inspection online. Environmental Health Division
areas of the county. In addition to the local permitting fees, fees will also be assessed pursuant to O.C.G.A. including size of project, or phase under construction, in acres. For questions, please contact the Site Plan Review Section at (770) 528-2147. Do You Need a Permit to Remove a Tree in Cobb County? existing and finished grades (in accordance with a one-foot contour interval for tracts trout streams, any other documentation that the community development department may The property must be your primary residence; it cannot be a property you rent or lease to tenants. Home Government Services Community Development Land Disturbance Permitting Development Process Development Process All construction must comply with current codes, including the zoning ordinance, subdivision regulations, tree ordinance, erosion and sedimentation control ordinance. 8:00am - 5:00pm. Call the Forestry Commission at (770) 528-3195 for more information. To cancel your inspectionby text message, send "CANCEL" to877-376-1455. P.O. comdev@cobbcounty.org, Mailing Address
Office Hours
P.O. PDF RESIDENTIAL PERMITTING FEES - Amazon Web Services, Inc. of the soil types, geological, and hydrological characteristics, topography, watershed, of any permit pursuant to this article serve to impose any liability upon the county, Monday - Friday
No. sediment control and stormwater management facilities, local ordinances, and state with payment processing or have any issues please email: ACASupport@cobbcounty.org. All design related to stormwater management under this article If you have any questions or require further clarification, please feel free to email us atthirdpartysubmit@cobbcounty.org, 2019 House Bill 493 (Private Permitting Review and Inspections) Overview and Policy, View the application packet for Private Permitting Review and Inspections (Pursuant to 2019 HB493). What is the purpose of this particular land disturbance permit? A County Arborist and Landscape Architect review projects for compliance with this ordinance and other environmentally related regulations. These plans shall include, the issuing authority. the Engineering Department Building Permit to Inspections & Code Submit Permit Application and Construction Documents for the . Once payment has been made, the application becomes a PERMIT. Call the Forestry Commission . 8:00am - 5:00pm, Checklists and Resources for New Businesses, New Tenant (Commercial Interior/Exterior Renovation), Commercial and Residential Building Permit Forms, Updated Backyard Chickens Ordinance Information, Corporation/LLC- Occupational Tax Certificate, Sole Proprietorship-Occupational Tax Certificate, Partnership/LLP-Occupational Tax Certificate, Temporary Alcoholic Beverage Application (for non-profit organizations only), Alcoholic Beverage License Application New Establishment/Change of Ownership, Food vs. Alcohol Beverage Sales Affidavit, Liquor by the Drink - Excise Tax Reporting Form, Change of Licensee/Substitute Licensee Form, Hotel/motel Occupancy Excise Tax Report Form, Recreational and Sports Tourism Services Fee, Rental Motor Vehicles Excise Tax Report Form, Teardown/Build Back, InFill Lots, Lot Splits Within Subdivisions, and Major Additions/Renovations, https://www.cobbcounty.org/community-development/news/schedule-your-inspection-, Electrical Subcontractor Permit Application. If a land disturbance permit is required, please follow either of the following procedures: For more information about this process, call the Site Plan Review Section at (770) 528-2147. approved maintenance schedule. 1150 Powder Springs St, Ste 400
laws. building@cobbcounty.org, Mailing Address
ACA and ePlan are linked, and run parallel to one another. the hydrologic or vegetative characteristics inside a protection area. To get a copy of your projects CO or LOC (Letter of completion) please send an email to subpermits@cobbcounty.org and be sure to include the permit number and complete address. be issued for any land disturbing activity within the protection area unless: The land disturbing activity is for the purpose of constructing one of the following: A stream crossing by a driveway, transportation route, or public utility; A detention, retention, or sediment control pond or facility; A transportation route or utility line parallel to a stream when, due to natural conditions A demolition permit is not required to tear down a deck, patio or porch or retaining wall structure. (There may be Zoning stipulations associated with your property that may impose further limitations on detached structures. Painting, papering, tiling, carpeting, cabinets, counter tops and other finish work. Kevin Gobble, Development & Inspections: Main
- TREE PRESERVATION AND REPLACEMENT Sec. Cobb County Georgia Ordinance and Tree Removal Permit Permit offices are open Monday - Friday 8 - 5 p.m. The Inspections office is responsible for administering and enforcing all applicable building codes with regard to residential and commercial construction in the permitting jurisdiction of the unincorporated areas of Cobb County. Please note, the following list is for reference only. To request records on a particular project or piece of property, please visit the Open Records Center. Inspections can be scheduled via Selectxt (Text to schedule) or via the Cobb County Citizens Access Portal. No land disturbance permit will issued without verification that the owner/developer of the project has a valid Cobb County Occupation Tax Certificate / Business License or registration. Follow this step-by-step guide to obtain a C/O for your new or existing business in a commercial building within Unincorporated Cobb. Copyright 2023 by eLaws. View/download the Cobb County Commercial Permit Application Form. Post-construction inspection of tree plantings and/or tree save areas to ensure that the ordinance requirements have been satisfied. and maintenance of erosion sediment control devices. Erosion Control Maintenance Bond is $1,000 per disturbed acre. There is no online tool to apply for an area-wide land disturbance permit. P.O. The ePlan portal is for uploading documents, receiving feedback from reviewers, and editing projects after review cycles. Unless otherwise exempted, all land-disturbing activities in unincorporated Cobb County must be regulated via the issuance of a Land Disturbance Permit (LDP). percent or greater ground slope, 1:100 or larger scale), existing and proposed watercourses, Yes, approval must be obtained from the Environmental Health Division of the Cobb & Douglas Board of Health prior to applying for a building permit of any kind. disturbance permit for clearing and grading projects may only be obtained if such and Sedimentation Control in Georgia or other appropriate publication. Once each department has verified that all comments have been addresses, the surveyor takes the paper plat to Cobb County Water System (CCWS) for signature (if required, a signature from the Environmental Health Division is obtained first). An application for a land disturbance permit shall be made to the community development As we continue to resume normal inspections operations we will also further adhere to Cobb Countys policy and procedures for third-party provider inspections. Allow 1-2 business days for a response to your request. NCG01 Permit Information - After receiving E&SC Plan approval, the next step is to fill out and submit an electronic Notice of Intent (e-NOI) form to receive a Certificate of Coverage (COC) under the NCG01 Permit. PDF 1. What is the purpose of this particular land disturbance permit? Compliance with SFHA restrictions is confirmed via the use of the FEMA elevation certificate. In addition, staff verifies that the proposed project does not encroach into or conflict with any overhead or underground utility line or easement. Property owners are solely responsible for compliance with all applicable restrictive covenants and homeowners' association rules and regulations. Search | Cobb County Georgia If approved by zoning you will next go to the Site Plan Review desk to have your site plan and drawings approved. Vegetative plans for all temporary and permanent vegetative measures, including species, The Inspections office is responsible for administering and enforcing all applicable building codes with regard to residential and commercial construction in the permitting jurisdiction of the unincorporated areas of Cobb County. Once the plans have been reviewed and all revisions completed, the County will email the applicant the permit fee based on the original applicants. Jessica Guinn, Director
All Development and Inspection Fee Schedules will be updated effective April 1, 2023. Applicant revises plans in response to staff comments. Prefabricated swimming pools that are less than 12 inches deep with a circulation system. Click here for a full list of Development & Inspection fee schedules. The surveyor must email a pdf of the recorded plat to SPR before any building permits can be issued. Cobb County Commercial Permit Application Form All Cobbcounty - signNow The Inspections officeprovides assistance to our customers so that they may understand and meet the code requirements for their project. Each month the Cobb County Zoning Division prepares zoning analysis information, which provides analysis and staff recommendations for all rezoning, special land use permits, land use permit requests and variance requests. Once a permit has been issued, all applicants are obligated to continue the building and inspections process using the House Bill 493 policy as outlined by Cobb County. proposed land development in the stream buffer, limits and square footage areas of No square footage being added to home: includes remodeling a kitchen or bathroom, tearing down walls, etc. The following forms are available for contractors to download, stamp, and submit to the Site Inspections Section. Retaining Wall Permit:Retaining walls 30 inches and taller must be permitted. Contact the Development and Inspections Division. not provide for effective erosion and sediment control, additional erosion and sedimentation All LDPs are issued by the Site Plan Review Section under the issuing authority of the Community Development Agency. All permit application forms and checklists can be found by clicking here.